Field Operations Home

Water FAQs
  - Water FAQs
  - Wastewater FAQs
  - Drainage FAQs
- Publications
- Easements

Water
- Drinking Water Standards
- Potable Water Storage
- How to Shut Off Your Water
- Bill Seem Too High?
- River Friendly Car Washing Tips

Wastewater
- Treatment Process Overview
  - Aeration Ponds
  - Dissolved Air Floatation
  - Disinfection
  - Equalization Basin
  - Reuse
- Facilities

Drainage
- Overview
- Stormwater Quality
- Easements

Click here for the District's Public Records Information Request Policy.

 

For more information about using PDF files or to download the latest version of Adobe Acrobat for free, click here.

Water Publications

All Files in pdf format. We are constantly updating this web page to add additional reports as they are approved.

2009 Annual Water Department Report

Director of Field Operations reviewed the Water Department Operations. Use the link below to view the presentation.

            2009 Annual Water Department Report

Sewer System Management Plan

The District is now required to comply with the State Water Resources Control Board, Order No. 2006-0003 DWQ, entitled "General Waste Discharge Requirements for Sanitary Sewer Systems" (WDR), administered and enforced by the Regional Water Quality Control Board. The Sewer System Management Plan (SSMP), prepared by HDR, dated September 2009, was adopted by the District Board on October 21, 2009. Use the link below to view the report.

            Sewer System Management Plan

Storm Water Management Program

The Storm Water Management Program for Rancho Murieta Community Services District General Permit for the Discharge of Storm Water from Small Municipal Separate Storm Sewer System (MS4) was approved by the State Water Board on June 22, 2009. Use the link below to view the approved report.

              Storm Water Management Program

Rancho Murieta Wastewater Reclamation Plant Operation Audit
The District contracted with PSOMAS in November of 2007 to conduct an operations audit of the wastewater reclamation plant. The final report was completed in April 2008. Use the link below to view the final report.

Rancho Murieta Wastewater Reclamation Plant Operational Audit

Wastewater Facilities Expansion and Financing Report

The District contracted with HydroScience Engineers (HSe) in December of 2006 to prepare a Wastewater Facilities Expansion and Financing Report. HSe began the background report preparation in January 2007. In the ensuing months, three public workshops were held including a 21 day public review and comment period. Use the link below to view the report. (Due to the size of this document, it is broken into four sections plus Appendices.)

Part A1 (8.4MB pdf)
Part A2 (4.5MB pdf)
Part B (2.2MB pdf)
Part C (6.9 MB pdf)
Appendices (2.4MB pdf)

Integrated Water Master Plan

The District contracted with HDR Engineering in March of 2005 to prepare an Integrated Water Master Plan. The final report was completed in November of 2006 and appendices in May of 2007. Use the link below to view the report.

Integrated Water Master Plan

Article from the CA Department of Health Services
The following is an informative article regarding coliform and drinking water.

Coliform and Drinking Water

Article from the CA Department of Water Resources
The following is a very useful article on adjusting sprinkler settings and also some helpful links about efficient water use.

Efficient Water Use

 

Publication Archives

Click here to go to the archive page.